- All work in the hall is on schedule. Platform is in, plate installed, RadPhi calorimeter removed, handrails being installed, catwalk due next week, surveyors coming Friday will scribe survey marks on wall and floor.

- cart, etc. should arrive Monday. Eric will be here for installation.

- no work on profiler/veto stand yet.

- turns out it is easy to drill/tap steel plate.

- pie tower still needs junk cleaned off.

- Mike McMullen will install one camera with pan/zoom by early next week, then another later on.

- TPE beamline now has 3 cm min aperture after Frascati magnet, should be fine for us.

- collimator box installed (we will use standard 2.6 mm collimator).

- one foot of air after target, remainder He except for 3 m vacuum total

- need to rope off area around platform during cart use

- Bert scheduled TOSP meeting Tues next week

- operation of the cart will require two trained operators plus one neutral observer

- Erik (RadCon) produced draft RSAD