Aug 30, 2011 Calorimetry

From GlueXWiki
Revision as of 15:15, 30 August 2011 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Beam test
    • Elton to check actual space in Hall B relative to the proposed drawing

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
      • We received 10 first article COMM boards from Total Electronics.
      • Assembly quality was not superb. The main problem was that the solder was not heated enough (dull and gray instead of shiny). Paul sent them back and we are waiting for a new batch.
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Simulations/Reconstruction
  7. Beam tests in Hall B (fall 2011) (Kei)
  8. Any other business

Minutes

Attending: Elton, Jim, Beni, Yi, Eugene (Jlab); Will (USM); Christine, Stratos (Athens); Zisis, Andrei (UofR).

  1. Announcements
  2. Review of Action Items
  3. Monitoring
    • Updates to paperwork, attempts to add most questions from procurement
    • The recently tested LEDs are going to be discontinued, not unexpected since the uniformity of tested samples was poor.
    • Stratos has found new options on the Osran web page, which will be investigated as soon as George Voulgaris returns next week. These are needed for the Bcal, which requires LEDs shining light parallel to the board.. (The Fcal LEDs an use previously tested units which shine light perpendicular to the board.
  4. Light guides. Will inquired as to light guide needs from Athens, UofR and Jlab.
    • Jlab can use up to 40 light guides (old or new dimensions) for gluing tests.
    • Athens originally requested 20 light guides, 12 to place on one side and 4 on the opposite of the Baby cal. They will revisit whether new or old dimensions are required
    • Zisis will revisit the UofR requirements and also if new or old dimensions are required.
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
      • We received 10 first article COMM boards from Total Electronics.
      • Assembly quality was not superb. The main problem was that the solder was not heated enough (dull and gray instead of shiny). Paul sent them back and we are waiting for a new batch.
  6. BCAL
    1. Construction Status: builds, fibre QA
  7. Simulations/Reconstruction
  8. Beam tests in Hall B (fall 2011) (Kei)
  9. Any other business