Difference between revisions of "Aug 26, 2010 Readout"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 26: | Line 26: | ||
#* Status of statement of work (SOW) | #* Status of statement of work (SOW) | ||
# [[SiPM Radiation Hardness Test]] (Update from Yi) | # [[SiPM Radiation Hardness Test]] (Update from Yi) | ||
+ | # Electronics/cooling | ||
# Geometry | # Geometry | ||
# Simulation runs | # Simulation runs | ||
# Cosmic-ray setup at UofR | # Cosmic-ray setup at UofR | ||
# Light guides | # Light guides | ||
− | # [[GlueX-Collaboration-Sep-2010 | Collaboration Meeting]] | + | # [[GlueX-Collaboration-Sep-2010 | Collaboration Meeting]] (Five 25-min sessions allocated) |
+ | #* SiPM report | ||
+ | #* Decisions: Fcal insert, monitoring/calibration | ||
= Minutes = | = Minutes = |
Revision as of 08:54, 26 August 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC L207 is 757-269-7084
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Testing goals and setup (Serguei)
- Will to find out if there is any feedback from USM on terms and conditions from our procurement package.
- Will to update statement of work for USM contract and develop detailed schedule.
- Collect this information of testing on the wiki for ease of presenting information. (USM)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- SiPM test stand (Alam)
- Status of statement of work (SOW)
- SiPM Radiation Hardness Test (Update from Yi)
- Electronics/cooling
- Geometry
- Simulation runs
- Cosmic-ray setup at UofR
- Light guides
- Collaboration Meeting (Five 25-min sessions allocated)
- SiPM report
- Decisions: Fcal insert, monitoring/calibration