# BCAL Updates | # BCAL Updates | ||
## BCAL Fabrication (Zisis) | ## BCAL Fabrication (Zisis) | ||
− | ### 'Big contract' signed (Aug.6). $195,000 until Sept 30, later extended to $220,407. | + | ### 'Big contract' signed (Aug.6). $195,000 until Sept 30, later extended to $220,407. [[Image:Example.jpg]] |
### Building of the ''Construction Prototype'' commenced (Aug. 18). Two builds, about 20 layers. | ### Building of the ''Construction Prototype'' commenced (Aug. 18). Two builds, about 20 layers. | ||
### Press: 'lunar lander' feet on rams are installed. One outermost cylinder has a leak; parts ordered; does not affect build. New, longer press swivel and locking arms will be made and press retrofitted; end pairs will be made and installed. | ### Press: 'lunar lander' feet on rams are installed. One outermost cylinder has a leak; parts ordered; does not affect build. New, longer press swivel and locking arms will be made and press retrofitted; end pairs will be made and installed. | ||
### Fibre sorting table ready and operational; Cu sheet glued with contact cement and tapped at the ends; grounded. | ### Fibre sorting table ready and operational; Cu sheet glued with contact cement and tapped at the ends; grounded. | ||
### QA tests on shipment-3 fibres continues. Some irregularities in atten length data: dependence on Kuraray pouch? Data being checked. | ### QA tests on shipment-3 fibres continues. Some irregularities in atten length data: dependence on Kuraray pouch? Data being checked. |
Revision as of 10:21, 20 August 2009
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09
Contents
Items for followup from previous meeting(s)
- Review calibration procedures
Documents to Review
Tentative Agenda
- Announcements
- Report from Bcal Readout Review submitted
- Review of Action Items
- FCAL Update
- Procurement update (Elton)
- BCAL Updates
- Fiber QA
- First-article report draft (Zisis)
- First-article report checks (Andrei)
- Lead QA
- First-article report draft (Zisis)
- Fabrication (Zisis)
- Reporting
- Readiness Review ?
- Fiber QA
- Simulations
- BCAL Readout
- MOU update?
- Testing of SiPM arrays (Fernando and Carl)
- Other business
Minutes
Attendees:
- Announcements
- Review of Action Items
- FCAL Update
- BCAL Updates
- BCAL Fabrication (Zisis)
- 'Big contract' signed (Aug.6). $195,000 until Sept 30, later extended to $220,407.
- Building of the Construction Prototype commenced (Aug. 18). Two builds, about 20 layers.
- Press: 'lunar lander' feet on rams are installed. One outermost cylinder has a leak; parts ordered; does not affect build. New, longer press swivel and locking arms will be made and press retrofitted; end pairs will be made and installed.
- Fibre sorting table ready and operational; Cu sheet glued with contact cement and tapped at the ends; grounded.
- QA tests on shipment-3 fibres continues. Some irregularities in atten length data: dependence on Kuraray pouch? Data being checked.
- BCAL Fabrication (Zisis)