Difference between revisions of "April 11, 2012 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Hardware Agenda)
(Hardware Agenda)
Line 18: Line 18:
 
# FDC Update [http://www.jlab.org/Hall-D/detector/fdc/documents/oxygen.pdf oxygen studies], [http://wwwold.jlab.org/htbin/PHYSICS/halld/enote112.pl logbook]
 
# FDC Update [http://www.jlab.org/Hall-D/detector/fdc/documents/oxygen.pdf oxygen studies], [http://wwwold.jlab.org/htbin/PHYSICS/halld/enote112.pl logbook]
 
# CDC Update
 
# CDC Update
## Construction Update [wire_map_example.pdf]
+
## Construction Update  
 +
 
 +
{| border="0" cellpadding="2"
 +
|+wiremap
 +
|[[Image:wiremap.png|thumb|x250px| ]]
 +
|}
 +
 
 
## Cosmic Calibration of the Chamber   
 
## Cosmic Calibration of the Chamber   
 
## Prototype [[CDC_prototype_more_on_timing_3]]
 
## Prototype [[CDC_prototype_more_on_timing_3]]

Revision as of 11:06, 11 April 2012

Meeting Time and Place

Wednesday April 11, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. FDC Update oxygen studies, logbook
  3. CDC Update
    1. Construction Update
wiremap
    1. Cosmic Calibration of the Chamber
    2. Prototype CDC_prototype_more_on_timing_3
  1. TDR Update

Tracking Software Agenda

  1. Announcements.
  2. Summary of current work on tracking.
  3. Where we need to focus work (Discussion)?