Difference between revisions of "April 1, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Action Items)
Line 32: Line 32:
 
== Action Items ==
 
== Action Items ==
  
* Set up PS parasitic meeting
+
* Set up next PS parasitic meeting
 
* Decide on Goni maintenance
 
* Decide on Goni maintenance
* Delineate ePAS permit requests for CPP install HDList
+
* Delineate ePAS permit requests for Isolation Certificate

Revision as of 08:15, 1 April 2022

Meeting Time and Place =

Friday April 1, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - fuel spill
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • FDC chiller repair - Josh
    • BCAL Coldshot Chiller commissioning - Josh
    • Target Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation
  • FCAL Insert Drawings
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Scot
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up next PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for Isolation Certificate