Difference between revisions of "Apr 7, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 12: Line 12:
 
# Action Items
 
# Action Items
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
# [[Test Setup for SiPMs | First article testing]] (Carl and Yi)
+
# [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110407.pptx 1st article test report] (Carl and Yi)
 
# Mechanical cooling (Jim)
 
# Mechanical cooling (Jim)
 
#* Review status of drawings for prototype (Chuck)
 
#* Review status of drawings for prototype (Chuck)

Revision as of 15:05, 7 April 2011

References

Action Items from previous meetings

  1. Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. 1st article test report (Carl and Yi)
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
  6. Temperature compensation (Jack)
  7. Preamp-summing (Fernando)
    • Will present a discussion of cabling and grounding next week.
  8. Discussion of production testing

Minutes

Attending: