Difference between revisions of "Apr 6, 2017 Calorimeter"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 20: Line 20:
 
= Action Items =
 
= Action Items =
  
# Determine number of saturation/underflows that exist in the two LED bias monitoring settings (Ahmed)
+
# <strike> Determine number of saturation/underflows that exist in the two LED bias monitoring settings (Ahmed) </strike> Working on periods with only one bias
# Understand the nature of the peak in the (Fcal propagated to target -RF) satellite peak of -2 ns (Adesh)
+
# <strike> Understand the nature of the peak in the (Fcal propagated to target -RF) satellite peak of -2 ns (Adesh) </strike> Under investigation. Will use LED data to investigate this and 4 ns shift in fADCs
 
# Disable red LED string in dark room to avoid leaving it on in the future. (Adesh)
 
# Disable red LED string in dark room to avoid leaving it on in the future. (Adesh)
# Quantify the LED pulser sector jumps within one run (Ahmed)
+
# <strike> Quantify the LED pulser sector jumps within one run (Ahmed) </strike> Investigation of outliers continues under study.
  
 
= References =
 
= References =
Line 48: Line 48:
 
= Minutes =
 
= Minutes =
  
''Attendees:
+
''Attendees: Elton, Adesh, Mark (JLab); Sean (NW); Will (CMU); Andrei, Zisis, Ahmed (UofR); Matt (IU); Christina (Athens)
 +
 
 +
# Announcements
 +
# [[GlueX-Collaboration-May-2017|Collaboration Meeting]] May 15-17, 2017
 +
# Action Items
 +
# Activities during the down
 +
# FCAL update
 +
# BCAL update
 +
# Calibrations
 +
## [https://logbooks.jlab.org/entry/3469359 BCAL gain calib] (Will M.)
 +
## [https://logbooks.jlab.org/entry/3469116 ADC timing: 4 ns run-to-run shifts in certain BCAL channels]
 +
## [https://logbooks.jlab.org/entry/3469166 BCAL gain drifts: Spring 2017 all runs]
 +
# Reconstruction and Simulation
 +
# NIM articles
 +
# Any other business

Revision as of 12:21, 6 April 2017

Video Conferencing Information

Meeting Time: 11:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

  1. Determine number of saturation/underflows that exist in the two LED bias monitoring settings (Ahmed) Working on periods with only one bias
  2. Understand the nature of the peak in the (Fcal propagated to target -RF) satellite peak of -2 ns (Adesh) Under investigation. Will use LED data to investigate this and 4 ns shift in fADCs
  3. Disable red LED string in dark room to avoid leaving it on in the future. (Adesh)
  4. Quantify the LED pulser sector jumps within one run (Ahmed) Investigation of outliers continues under study.

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book

Tentative Agenda

  1. Announcements
  2. Collaboration Meeting May 15-17, 2017
  3. Action Items
  4. Activities during the down
  5. FCAL update
  6. BCAL update
  7. Calibrations
    1. BCAL gain calib (Will M.)
    2. ADC timing: 4 ns run-to-run shifts in certain BCAL channels
    3. BCAL gain drifts: Spring 2017 all runs
  8. Reconstruction and Simulation
  9. NIM articles
  10. Any other business

Minutes

Attendees: Elton, Adesh, Mark (JLab); Sean (NW); Will (CMU); Andrei, Zisis, Ahmed (UofR); Matt (IU); Christina (Athens)

  1. Announcements
  2. Collaboration Meeting May 15-17, 2017
  3. Action Items
  4. Activities during the down
  5. FCAL update
  6. BCAL update
  7. Calibrations
    1. BCAL gain calib (Will M.)
    2. ADC timing: 4 ns run-to-run shifts in certain BCAL channels
    3. BCAL gain drifts: Spring 2017 all runs
  8. Reconstruction and Simulation
  9. NIM articles
  10. Any other business