Difference between revisions of "Apr 29, 2010 Calorimetry"
From GlueXWiki
(→Table of Options DRAFT) |
(→Table of Options DRAFT) |
||
Line 24: | Line 24: | ||
|+ Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3 | |+ Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3 | ||
|- | |- | ||
− | ! Configuration !! Block Size (mm2) !! Length(MM) !! X0 (mm) !! Sum X0 !! Delta SC (mm) !! Delta Pb (mm) !! c1 !! c2 !! c3 | + | ! Configuration !! Block Size (mm2) !! Length(MM) !! X0 (mm) !! Sum X0 !! Moliere Radius (cm) !! Delta SC (mm) !! Delta Pb (mm) !! c1 !! c2 !! c3 |
|- | |- | ||
− | | Pb glass F8-00 || 40x40 || | + | | Pb glass F8-00 || 40x40 || 450 || 31 || 14.5 || 43 || - || - || 7.4? || 3.6? || 0 |
|- | |- | ||
− | | Pb glass F108 || 40x40 || | + | | Pb glass F108 || 40x40 || 450 || 31? || 14.5 || || - || ? || ? || 0 |
|- | |- | ||
− | | Shashlyk COMPASS || 38x38 || 500 (392) || 15.6 || 25 || 1.5 || 0.8 || 6 || 0 || 0 | + | | Shashlyk COMPASS || 38x38 || 500 (392) || 15.6 || 25 || || 1.5 || 0.8 || 6 || 0 || 0 |
|- | |- | ||
− | | Shashlyk | + | | Shashlyk PANDA || 110x110 || 675 || 34 || 20 || 59 || 1.5 || 0.275 || 3.59 || 1.1 || 0.9 |
|- | |- | ||
− | | Shashlyk KOPIO | + | | Shashlyk KOPIO PMT || 110x110 ||525 || 37 || 14.3 || || 1.5 || 0.25 || 3.59 || 1.1 || 0.9 |
|- | |- | ||
− | | PbWO4 PRIMEX || 20.5x20.5 || 180 || 8.9 || 20 || - || - || 2.6 || - || - | + | | Shashlyk KOPIO APD || 110x110 || 525 || 37 || 14.3 || || 1.5 || 0.25 || 2.77 || 1.7 || 0.27 |
+ | |- | ||
+ | | PbWO4 PRIMEX || 20.5x20.5 || 180 || 8.9 || 20 || || - || - || 2.6 || - || - | ||
|} | |} | ||
Revision as of 10:24, 29 April 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Contents
Items for followup from previous meeting(s)
- Monitoring
- Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
- Fcal
- Draft agenda for Readiness Review (Elton and Matt)
- Decision on rad hard detectors
- Bcal
- Send copy of contract with Ross to JLab
- Report on beam test data at small incidence angles.
Table of Options DRAFT
Configuration | Block Size (mm2) | Length(MM) | X0 (mm) | Sum X0 | Moliere Radius (cm) | Delta SC (mm) | Delta Pb (mm) | c1 | c2 | c3 |
---|---|---|---|---|---|---|---|---|---|---|
Pb glass F8-00 | 40x40 | 450 | 31 | 14.5 | 43 | - | - | 7.4? | 3.6? | 0 |
Pb glass F108 | 40x40 | 450 | 31? | 14.5 | - | ? | ? | 0 | ||
Shashlyk COMPASS | 38x38 | 500 (392) | 15.6 | 25 | 1.5 | 0.8 | 6 | 0 | 0 | |
Shashlyk PANDA | 110x110 | 675 | 34 | 20 | 59 | 1.5 | 0.275 | 3.59 | 1.1 | 0.9 |
Shashlyk KOPIO PMT | 110x110 | 525 | 37 | 14.3 | 1.5 | 0.25 | 3.59 | 1.1 | 0.9 | |
Shashlyk KOPIO APD | 110x110 | 525 | 37 | 14.3 | 1.5 | 0.25 | 2.77 | 1.7 | 0.27 | |
PbWO4 PRIMEX | 20.5x20.5 | 180 | 8.9 | 20 | - | - | 2.6 | - | - |
See Property Table from Eugene
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration/Monitoring
- FCAL
- Construction status
- Readiness Review
- To shashlyk or not to shashlyk. Options (Elton) see Table. Physics Impact, see GlueX-doc-1481
- BCAL
- Construction Status
- Simulations
- Other Updates
Minutes
Attendees: