Difference between revisions of "Apr 15, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Table of Options =)
Line 18: Line 18:
 
#* Finalize invoicing details for Fcal contract (Elton and Matt)
 
#* Finalize invoicing details for Fcal contract (Elton and Matt)
  
= Table of Options ==
+
= Table of Options =
 
{| border=1
 
{| border=1
 
|+ Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3
 
|+ Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3

Revision as of 10:45, 15 April 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
  2. Fcal
    • Decision on rad hard detectors
    • Finalize invoicing details for Fcal contract (Elton and Matt)

Table of Options

Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3
Configuration Block Size (mm2) Length(MM) X0 (mm) Sum X0 Delta SC (mm) Delta Pb (mm) c1 c2 c3
Pb glass F8-00 40x40 40 31 12.9 - - 7.4? 3.6? 0
Pb glass F108 40x40 40 31? 12.9 - -  ?  ? 0
Shashlyk COMPAS 38x38 500 (392) 15.6 25 1.5 0.8 6 0 0
Shashlyk KOPIO PMT 110x110 525 34 15 1.5 0.25 3.59 1.1 0.9
Shashlyk KOPIO APD 110x110 525 34 15 1.5 0.25 2.77 1.7 0.27
PbWO4 PRIMEX 20.5x20.5 180 8.9 20 - - 2.6 - -

See Property Table from Eugene

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. FCAL
    1. Construction status
    2. Readiness Review
    3. To shashlyk or not to shashlyk. Options (Elton) see Table.
  5. BCAL
    1. Construction Status
    2. Responsibility for BCAL reconstruction software
      • David Lawrence's talk at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
  6. Simulations
  7. Other Updates

Minutes

Attendees: