Difference between revisions of "Apr 15, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 29: Line 29:
 
| Pb glass F108  || 40x40  || 40 || 3.1 || 12.9 || - || -  || 7.4 || 3.6 || 0  
 
| Pb glass F108  || 40x40  || 40 || 3.1 || 12.9 || - || -  || 7.4 || 3.6 || 0  
 
|-  
 
|-  
| Shashlyk COMPAS  || 38x38  || 1.56 || 500 (392) || 25 || 1.5 || 0.8  || 6 || 0 || 0  
+
| Shashlyk COMPAS  || 38x38  || 500 (392) || 1.56 || 25 || 1.5 || 0.8  || 6 || 0 || 0  
 
|-  
 
|-  
 
| Shashlyk KOPIO PMT || 110x110 ||525  || 3.4  || 15 || 1.5 || 0.25  || 3.59 || 1.1 || 0.9  
 
| Shashlyk KOPIO PMT || 110x110 ||525  || 3.4  || 15 || 1.5 || 0.25  || 3.59 || 1.1 || 0.9  

Revision as of 10:37, 15 April 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
  2. Fcal
    • Decision on rad hard detectors
    • Finalize invoicing details for Fcal contract (Elton and Matt)

Documents to Review

Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3
Configuration Block Size (mm2) Length X0 (cm) Sum X0 Delta SC (mm) Delta Pb (mm) c1 c2 c3
Pb glass F8-00 40x40 40 3.1 12.9 - - 7.4 3.6 0
Pb glass F108 40x40 40 3.1 12.9 - - 7.4 3.6 0
Shashlyk COMPAS 38x38 500 (392) 1.56 25 1.5 0.8 6 0 0
Shashlyk KOPIO PMT 110x110 525 3.4 15 1.5 0.25 3.59 1.1 0.9
Shashlyk KOPIO APD 110x110 525 3.4 15 1.5 0.25 2.77 1.7 0.27
PbWO4 PRIMEX 20.5x20.5 180 0.89 20 - - 2.6 - -

See Property Table from Eugene

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. FCAL
    1. Construction status
    2. Readiness Review
    3. To shashlyk or not to shashlyk
  5. BCAL
    1. Construction Status
    2. Responsibility for BCAL reconstruction software
      • David Lawrence's talk at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
  6. Simulations
  7. Other Updates

Minutes

Attendees: