Difference between revisions of "Apr 15, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 25: Line 25:
 
! Configuration !! Block Size (mm2) !! Sum X0 !! Delta SC (mm) !! Delta Pb (mm) !! c1 !! c2 !! c3  
 
! Configuration !! Block Size (mm2) !! Sum X0 !! Delta SC (mm) !! Delta Pb (mm) !! c1 !! c2 !! c3  
 
|-  
 
|-  
| COMPAS  || 38x38  || 25 || 1.5 || 0.8  || 6 || 0 || 0  
+
| Shashlyk COMPAS  || 38x38  || 25 || 1.5 || 0.8  || 6 || 0 || 0  
 
|-  
 
|-  
| KOPIO PMT || 110x110  || 15 || 1.5 || 0.25  || 3.59 || 1.1 || 0.9  
+
| Shashlyk KOPIO PMT || 110x110  || 15 || 1.5 || 0.25  || 3.59 || 1.1 || 0.9  
 
|-  
 
|-  
| KOPIO APD || 110x110  || 15 || 1.5 || 0.25  || 2.77 || 1.7 || 0.27  
+
| Shashlyk KOPIO APD || 110x110 || 15 || 1.5 || 0.25  || 2.77 || 1.7 || 0.27
 +
|-
 +
| PbWO PRIMEX || 20.5x20.5 || 15 || 1.5 || 0.25  || 2.77 || 1.7 || 0.27  
 
|}
 
|}
  

Revision as of 09:40, 15 April 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
  2. Fcal
    • Decision on rad hard detectors
    • Finalize invoicing details for Fcal contract (Elton and Matt)

Documents to Review

Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3
Configuration Block Size (mm2) Sum X0 Delta SC (mm) Delta Pb (mm) c1 c2 c3
Shashlyk COMPAS 38x38 25 1.5 0.8 6 0 0
Shashlyk KOPIO PMT 110x110 15 1.5 0.25 3.59 1.1 0.9
Shashlyk KOPIO APD 110x110 15 1.5 0.25 2.77 1.7 0.27
PbWO PRIMEX 20.5x20.5 15 1.5 0.25 2.77 1.7 0.27

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. FCAL
    1. Construction status
    2. Readiness Review
    3. To shashlyk or not to shashlyk
  5. BCAL
    1. Construction Status
    2. Responsibility for BCAL reconstruction software
      • David Lawrence's talk at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
  6. Simulations
  7. Other Updates

Minutes

Attendees: