Difference between revisions of "Apr 15, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 21: Line 21:
  
 
{| border=1
 
{| border=1
|+ Trigger conditions for Runs
+
|+ Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3
 
|-
 
|-
! Run Range !! Beam Current (nA) !! Bit 5 prescale !! ASYNCH || Comment
+
! Configuration !! Block Size (mm2) !! Sum X0 !! Delta SC (mm) !! Delta Pb (mm) !! c1 !! c2 !! c3
 
|-  
 
|-  
| 45548-45556 || align=center | 30 || align=center | 20+1 || align=center | T1-19        ||
+
| COMPAS  || 38x38  || 25 || 1.5 || 0.8  || 6 || 0 || 0
 
|-  
 
|-  
| 45558-45563 || align=center | 30 || align=center | 20+1 || align=center | ST*T1-19 ||
+
| KOPIO PMT || 110x110  || 15 || 1.5 || 0.25 || 3.59 || 1.1 || 0.9
 
|-  
 
|-  
| 45976-46113 || align=center | 30 || align=center |   4+1 || align=center | ST*T1-19 ||
+
| KOPIO APD || 110x110  || 15 || 1.5 || 0.25 || 2.77 || 1.7 || 0.27
 
|}
 
|}
  

Revision as of 09:38, 15 April 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
  2. Fcal
    • Decision on rad hard detectors
    • Finalize invoicing details for Fcal contract (Elton and Matt)

Documents to Review

Configurations for Fcal calorimter insert, assume sigma/E = c1/sqrt(E) + c2 + c3
Configuration Block Size (mm2) Sum X0 Delta SC (mm) Delta Pb (mm) c1 c2 c3
COMPAS 38x38 25 1.5 0.8 6 0 0
KOPIO PMT 110x110 15 1.5 0.25 3.59 1.1 0.9
KOPIO APD 110x110 15 1.5 0.25 2.77 1.7 0.27

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. FCAL
    1. Construction status
    2. Readiness Review
    3. To shashlyk or not to shashlyk
  5. BCAL
    1. Construction Status
    2. Responsibility for BCAL reconstruction software
      • David Lawrence's talk at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
  6. Simulations
  7. Other Updates

Minutes

Attendees: