## Construction Status
 
## Construction Status
 
## Responsibility for BCAL reconstruction software
 
## Responsibility for BCAL reconstruction software
 +
##* [[Media:20100406_bcal_recon.pdf|David Lawrence's talk]] at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
 
# Simulations
 
# Simulations
 
# Other Updates
 
# Other Updates

Revision as of 09:38, 14 April 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
  2. Fcal
    • Decision on rad hard detectors
    • Finalize invoicing details for Fcal contract (Elton and Matt)

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. FCAL
    1. Construction status
    2. Readiness Review
    3. To shashlyk or not to shashlyk
  5. BCAL
    1. Construction Status
    2. Responsibility for BCAL reconstruction software
      • David Lawrence's talk at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
  6. Simulations
  7. Other Updates

Minutes

Attendees: