Difference between revisions of "2024-01-11"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Coordinates == The meeting will be on Thursday, January 11, 2024 at 11:00 AM ET. For those in-person at JLab F326 is reserved ==== Connecting ==== To connect to...")
 
(Agenda)
Line 12: Line 12:
 
#* [[GlueX-Collaboration-Feb-2024 | Winter GlueX Meeting]] is February 21-23 at Florida State U. (Tallahassee, FL)
 
#* [[GlueX-Collaboration-Feb-2024 | Winter GlueX Meeting]] is February 21-23 at Florida State U. (Tallahassee, FL)
 
#* [[Workshop on Polarized Target Studies with Real Photons in Hall D]] on the morning of February 21
 
#* [[Workshop on Polarized Target Studies with Real Photons in Hall D]] on the morning of February 21
 +
#* Summer Collaboration Meeting dates set: May 14-16
 
#* [https://forms.gle/UVHiUKrVN6pe3d6z8 Physics Discussion Questions]
 
#* [https://forms.gle/UVHiUKrVN6pe3d6z8 Physics Discussion Questions]
 
# GlueX Election Results (Justin)
 
# GlueX Election Results (Justin)
Line 18: Line 19:
 
#* GlueX-III (Justin/Lubomir/Matt)
 
#* GlueX-III (Justin/Lubomir/Matt)
 
#** Last Meeting:  [[ GlueX_Phase_III_8-Jan-24 | January 8 ]]
 
#** Last Meeting:  [[ GlueX_Phase_III_8-Jan-24 | January 8 ]]
#* Beam Polarization Run Group (Peter/Mark)
+
#* Beam Polarization Run Group (Peter/Farah/Mark)
 
# FCAL2 Construction Report (Tim/Malte/Sasha/Eugene)
 
# FCAL2 Construction Report (Tim/Malte/Sasha/Eugene)
 
# [https://halldweb.jlab.org/wiki-private/index.php/Private:Papers_Under_Review Publication Status Report] (Sean)
 
# [https://halldweb.jlab.org/wiki-private/index.php/Private:Papers_Under_Review Publication Status Report] (Sean)
Line 39: Line 40:
 
*** [https://halldweb.jlab.org/wiki-private/index.php/GlueX_April_APS_2024 April APS abstracts]
 
*** [https://halldweb.jlab.org/wiki-private/index.php/GlueX_April_APS_2024 April APS abstracts]
 
** Amplitude Analysis: [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_January_8,_2024 January 8, 2024] (Alex A./Malte)
 
** Amplitude Analysis: [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_January_8,_2024 January 8, 2024] (Alex A./Malte)
** Cross-section: [https://halldweb.jlab.org/wiki-private/index.php/December_13,_2023,_Cross_Section_Working_Group December 13, 2023]  (Justin/Susan)
+
** Cross-section: [https://doodle.com/meeting/participate/id/eEK8rDWb Doodle poll for new meeting time for next week]  (Justin/Susan)
 
** Beam Asymmetry: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2023-12-04 December 4, 2023] (Zisis/Simon)
 
** Beam Asymmetry: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2023-12-04 December 4, 2023] (Zisis/Simon)
 
** PrimEx Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Jan_5,_2024_PrimEx-Eta_Meeting January 5, 2024]  
 
** PrimEx Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Jan_5,_2024_PrimEx-Eta_Meeting January 5, 2024]  

Revision as of 22:28, 10 January 2024

Meeting Coordinates

The meeting will be on Thursday, January 11, 2024 at 11:00 AM ET. For those in-person at JLab F326 is reserved

Connecting

To connect to the meeting, please go to the listing of Zoom meetings on the private Wiki and select the GlueX/Hall D Biweekly Meeting link at the top of the list.

Agenda

  1. Announcements
  2. GlueX Election Results (Justin)
  3. March Run Status (Eugene)
  4. Anticipated PAC Proposals
    • GlueX-III (Justin/Lubomir/Matt)
    • Beam Polarization Run Group (Peter/Farah/Mark)
  5. FCAL2 Construction Report (Tim/Malte/Sasha/Eugene)
  6. Publication Status Report (Sean)
  7. Data Calibration, Monitoring, and Production (Naomi/Igal)
  8. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • volunteers for data quality monitoring
    • TAGH calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework

Additional brief reports from working groups as needed

  • Hardware Working Groups:
    • Engineering Activities (Tim)
    • Electronics and Firmware (Fernando)
    • Beamline: last meeting was March 29, 2023 (Richard)
    • Tracking: December 7, 2023 (Naomi/Lubomir)
    • DIRC (Justin)
    • Online Systems: DAQ (Sergey)
    • Controls: November 30, 2023 (Hovanes)
    • Trigger (Sasha)
    • Calorimetry: last meeting was November 15, 2023 (Zisis/Mark/Sasha)
    • Start Counter (Beni)
    • TOF (Paul)