Difference between revisions of "2018-01-30"
From GlueXWiki
(→Analysis Activities) |
(→The Spring 2018 Runs) |
||
Line 20: | Line 20: | ||
* Official Run Schedule [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html 2017/2018] | * Official Run Schedule [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html 2017/2018] | ||
* [[Run_Coordination_Meetings:Fall2017_Spring2018_Run|Run Coordination Meeting]] | * [[Run_Coordination_Meetings:Fall2017_Spring2018_Run|Run Coordination Meeting]] | ||
+ | * [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Run Statistics] | ||
* Running Shifts | * Running Shifts | ||
Latest revision as of 12:02, 30 January 2018
Contents
Meeting Time and Place
The meeting will be on Tuesday January 30, 2018 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room A110.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Collaboration Meeting February 22-24, 2018 at JLab.
The Spring 2018 Runs
- Official Run Schedule 2017/2018
- Run Coordination Meeting
- Run Statistics
- Running Shifts
Analysis Activities
- Offline Software January 26, 2018 Meeting and Mark's Notes
- Update on OSG and NSERC Activities
- Production and Analysis Working Group January 24, 2018
- Physics Working Group January 23, 2018
- Amplitude Analysis Working Group January 29, 2018
- Di-lepton Working Group January 3, 2018
- η/η' Working Group January 29, 2018
Data Acquisition and Electronics Systems
- Online Systems 2-Oct-2017
- Online Systems
- DAQ
- Controls Status
- Monitoring
- High-intensity Running
- Electronics and Trigger
- Electronics Update
- Level-1 Trigger
- Firmware Updates
Detector Updates
- Engineering Activities
- Magnets
- Target
- DIRC
- Other Activities
- Beamline Status January 22, 2018
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter [GlueX Start Counter Meeting January 11, 2018|January 11, 2018]]
- Tracking November 30, 2017
- CDC
- FDC
- Calorimeters: January 11, 2018
- BCAL
- FCAL
- TOF January 3, 2018
- DIRC System January 9, 2018 DIRC
Other Activities
- AOT