Difference between revisions of "2014-04-02"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday April 2, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == Mee...") |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 25: | Line 25: | ||
== Agenda == | == Agenda == | ||
=== Announcements === | === Announcements === | ||
+ | * [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14 | ||
+ | * Iterating with the Tomsk State University group on an MOU. | ||
+ | * First draft of shift policy report this morning. | ||
+ | * Hints that a DIRC decision is imminent. | ||
=== Needed Written Material === | === Needed Written Material === | ||
− | * [https:// | + | * [https://halldweb.jlab.org/wiki/index.php/StatusTable TDR Status] |
* [[Summer 2014 Manpower Contributions]] | * [[Summer 2014 Manpower Contributions]] | ||
* [[Private:Service Statements | Service Statements]] | * [[Private:Service Statements | Service Statements]] | ||
Line 33: | Line 37: | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters: | * Calorimeters: | ||
− | ** Calorimetry [[Mar | + | ** FCAL Cosmics [https://logbooks.jlab.org/entry/3279414] |
+ | ** Calorimetry [[Mar 25, 2014 Calorimetry| March 25, 2014]] | ||
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-03-06 | March 6, 2014]] | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-03-06 | March 6, 2014]] | ||
− | * Tracking FADC FPGA [[ | + | * Tracking FADC FPGA [[FADC_Data_Format_Apr_1,_2014 |April 1, 2014]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, March | + | ** TOF [[GlueX TOF Meeting, March 27, 2014|March 27, 2014]] |
− | ** Start Counter [[GlueX Start Counter Meeting, March | + | ** Start Counter [[GlueX Start Counter Meeting, March 20, 2014#Minutes|March 20, 2014]] |
** PID Upgrades [[January 31, 2014 PID Upgrade|January 31, 2014]] | ** PID Upgrades [[January 31, 2014 PID Upgrade|January 31, 2014]] | ||
* Engineering | * Engineering | ||
Line 49: | Line 54: | ||
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
− | ** Hardware (Level-1) [[OWG Meeting | + | ** Hardware (Level-1) [[OWG Meeting 26-Mar-2014 |March 26, 2014]] |
** Software (Level-3) [[February 4, 2014| February 4, 2014]] | ** Software (Level-3) [[February 4, 2014| February 4, 2014]] | ||
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 26-Mar-2014 |March 26, 2014]] |
* Offline Software | * Offline Software | ||
− | ** Offline [[GlueX Offline Meeting, March | + | ** Offline [[GlueX Offline Meeting, March 19, 2014|March 19, 2014]] |
− | ** Data Challenge Meeting [[GlueX Data Challenge Meeting, March | + | ** Data Challenge Meeting [[GlueX Data Challenge Meeting, March 28, 2014|March 28, 2014]] |
− | ** Calibration [[March | + | ** Calibration [[March 26, 2014 Calibration| March 26, 2014]] |
− | * Photon Beam and Tagger [[BLTWG Meeting 03/ | + | * Photon Beam and Tagger [[BLTWG Meeting 03/31/2014|March 31, 2014]] |
− | * Physics [[ | + | * Physics [[March 24, 2014, Physics Working Group|March 24, 2014]] |
Latest revision as of 11:10, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday April 2, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Collaboration Meeting May 12-14
- Iterating with the Tomsk State University group on an MOU.
- First draft of shift policy report this morning.
- Hints that a DIRC decision is imminent.
Needed Written Material
Reports from Technical Groups
- Calorimeters:
- FCAL Cosmics [1]
- Calorimetry March 25, 2014
- BCAL Reconstruction March 6, 2014
- Tracking FADC FPGA April 1, 2014
- CDC
- FDC
- PID
- TOF March 27, 2014
- Start Counter March 20, 2014
- PID Upgrades January 31, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation January 3, 2014 Installation
- Electronics
- Trigger
- Hardware (Level-1) March 26, 2014
- Software (Level-3) February 4, 2014
- DAQ/Monitoring/Controls March 26, 2014
- Offline Software
- Offline March 19, 2014
- Data Challenge Meeting March 28, 2014
- Calibration March 26, 2014
- Photon Beam and Tagger March 31, 2014
- Physics March 24, 2014