Difference between revisions of "2012-01-25"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 47: Line 47:
 
*** Readout Segmentation [[BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011|November 28, 2011]]  
 
*** Readout Segmentation [[BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011|November 28, 2011]]  
 
** Tracking [[January 4, 2012 Tracking CDC/FDC | January 4, 2012]]
 
** Tracking [[January 4, 2012 Tracking CDC/FDC | January 4, 2012]]
** TOF [[GlueX TOF Meeting, December 12, 2011#Minutes|December 12, 2011]]   
+
** TOF [[GlueX TOF Meeting, January 19, 2012#Minutes|January 19, 2012]]   
** Start Counter [[GlueX Start Counter Meeting, November 17, 2011#Minutes|November 17, 2011]],
+
** Start Counter [[GlueX Start Counter Meeting, January 12, 2012#Minutes|January 12, 2012]]
***[[Start Counter Cheat Sheet]]
+
 
** Engineering  
 
** Engineering  
 
*** Magnet
 
*** Magnet
*** Target [[GlueX Target Design Review, September 29, 2011|September 29, 2011]]
+
*** Target [https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20January%2024,%202012.pptx Jim Fochtman's talk]
 
*** Engineering Activities
 
*** Engineering Activities
 
** Electronics
 
** Electronics

Revision as of 12:10, 25 January 2012

Meeting Time and Place

The meeting will be on Wednesday January 25, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

3.) EVO:

   A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).

Agenda

  • Announcements
  • Collaboration Meeting Feb. 16-18, 2012.
  • Reviews and Reports
    • Updated 12-GeV Physics Case
    • Technical Design Report
    • Software Review
  • MOU and Contract Status
  • Beam Tests
  • Reports from Technical Groups.