Difference between revisions of "2011-11-02"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 38: | Line 38: | ||
* Beam Tests | * Beam Tests | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
− | ** Trigger/DAQ/Monitoring/Controls [[OWG Meeting | + | ** Trigger/DAQ/Monitoring/Controls [[OWG Meeting 26-Oct-2011 |October 26, 2011]] |
− | ** Tracking [[ | + | ** Tracking [[October 26, 2011 Tracking CDC/FDC | October 26, 2011]] |
** Calorimeters | ** Calorimeters | ||
*** Calorimetry [[Oct 11, 2011 Calorimetry|October 11, 2011]] | *** Calorimetry [[Oct 11, 2011 Calorimetry|October 11, 2011]] | ||
Line 49: | Line 49: | ||
** Engineering [[media: Up_yoke_on_pier.JPG | photo]] | ** Engineering [[media: Up_yoke_on_pier.JPG | photo]] | ||
** Electronics | ** Electronics | ||
− | ** Target [[GlueX Target | + | ** Target [[GlueX Target Design Review, September 29, 2011|September 29, 2011]] |
− | ** Offline Software [[GlueX Offline Meeting, | + | ** Offline Software [[GlueX Offline Meeting, October 19, 2011#Minutes|October 19, 2011]] |
− | ** Photon Beam and Tagger [[BLTWG Meeting | + | ** Photon Beam and Tagger [[BLTWG Meeting 10/31/2011|October 31, 2011]] |
** Physics [[August 15, 2011 (11:30AM), Physics Working Group|August 15, 2011]] | ** Physics [[August 15, 2011 (11:30AM), Physics Working Group|August 15, 2011]] | ||
* AOT | * AOT |
Revision as of 16:08, 1 November 2011
Meeting Time and Place
The meeting will be on Wednesday November 02, 2011 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Agenda
- Announcements
- MOU and Contract Status
- MOU Status
- UCONN
- FIU
- UVA
- UMass
- Construction Contracts
- Athens
- FSU
- CUA
- MOU Status
- Technical Design Report
- Beam Tests
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls October 26, 2011
- Tracking October 26, 2011
- Calorimeters
- Calorimetry October 11, 2011
- BCAL Readout November 1, 2011
- Readout Segmentation October 31, 2011
- TOF October 27, 2011
- Start Counter September 22, 2011
- Magnet
- Engineering photo
- Electronics
- Target September 29, 2011
- Offline Software October 19, 2011
- Photon Beam and Tagger October 31, 2011
- Physics August 15, 2011
- AOT