Difference between revisions of "2010-07-14"
From GlueXWiki
(→Agenda) |
|||
Line 31: | Line 31: | ||
** [[Private:Construction | All pending contracts are signed.]] | ** [[Private:Construction | All pending contracts are signed.]] | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
− | ** Trigger/DAQ/Monitoring/Controls ([[OWG Meeting | + | ** Trigger/DAQ/Monitoring/Controls ([[OWG Meeting 23-Jun-2010 | Minutes from June 23]]) |
− | ** Tracking ([[ | + | ** Tracking ([[July 7, 2010 Tracking CDC/FDC| Minutes from July 7 ]]) |
− | ** Calorimetry ([[ | + | ** Calorimetry ([[Jul 8, 2010 Calorimetry| Minutes from July 8]]) |
** Start Counter | ** Start Counter | ||
− | ** PID/TOF ([[GlueX PID Meeting, | + | ** PID/TOF ([[GlueX PID Meeting, July 9, 2010|Minutes from July 9]]) |
** Magnet | ** Magnet | ||
** Engineering | ** Engineering | ||
** Electronics | ** Electronics | ||
− | ** Offline Software ([[GlueX Offline Meeting, | + | ** Offline Software ([[GlueX Offline Meeting, July 13, 2010#Minutes|Minutes from July 13]]) |
− | ** Photon Beam and Tagger ([[BLTWG Meeting | + | ** Photon Beam and Tagger ([[BLTWG Meeting 07/12/2010|Minutes from July 12]]) |
** Physics ([[June 21, 2010 (11AM), Physics Working Group|Minutes from June 21]]) | ** Physics ([[June 21, 2010 (11AM), Physics Working Group|Minutes from June 21]]) | ||
* AOT | * AOT |
Latest revision as of 07:48, 14 July 2010
Meeting Time and Place
The meeting will be on Wednesday July 14, 2010 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-800-377-8846 : US +1-888-276-7715 : Canada +1-302-709-8424 : International then enter participant code: 77438230# (remember the "#")
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Agenda
- Announcements
- Upcoming Reviews
- GlueX PAC Presentation (August 2010)
- Magnet Review (September 2010)
- MOU and Contract Status
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls ( Minutes from June 23)
- Tracking ( Minutes from July 7 )
- Calorimetry ( Minutes from July 8)
- Start Counter
- PID/TOF (Minutes from July 9)
- Magnet
- Engineering
- Electronics
- Offline Software (Minutes from July 13)
- Photon Beam and Tagger (Minutes from July 12)
- Physics (Minutes from June 21)
- AOT