* Review the R&D reports due in 2008
 
* Review the R&D reports due in 2008
 
+
** BCAL:  
** BCAL:
+
 
     Measure the light output for cosmic muons with the first
 
     Measure the light output for cosmic muons with the first
 
     prototype SiPMT arrays and verify it is above 20 photo electrons.
 
     prototype SiPMT arrays and verify it is above 20 photo electrons.
 
     Deadline for DOE: 30-Jun-08
 
     Deadline for DOE: 30-Jun-08
 
 
** Tagger:
 
** Tagger:
 
     Develop a fabrication technique to build a prototype of the tagger
 
     Develop a fabrication technique to build a prototype of the tagger
 
     microscope and couple it to a SiPMT.
 
     microscope and couple it to a SiPMT.
 
     Deadline for DOE: 30-Jun-08
 
     Deadline for DOE: 30-Jun-08
 
 
** Electronics:
 
** Electronics:
 
     Auxiliary electronics prototyping: Report summarizing the concept
 
     Auxiliary electronics prototyping: Report summarizing the concept
Line 60: Line 57:
 
     be below 50ps
 
     be below 50ps
 
     Deadline for DOE: 31-Aug-08
 
     Deadline for DOE: 31-Aug-08
 
+
**  FADC:  
    FADC: Complete fabrication and testing of prototype v1 of the
+
    Complete fabrication and testing of prototype v1 of the
 
     master trigger module and collect signals from 2 energy sum modules in
 
     master trigger module and collect signals from 2 energy sum modules in
 
     parallel at 2.5 Gbits/sec
 
     parallel at 2.5 Gbits/sec
 
     Deadline for DOE: 31-Aug-08
 
     Deadline for DOE: 31-Aug-08
 
 
** FDC:
 
** FDC:
 
     Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
 
     Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
 
     Verify the wire placement is in +/- 50u.
 
     Verify the wire placement is in +/- 50u.
 
     Deadline for DOE: 30-Sep-08
 
     Deadline for DOE: 30-Sep-08
 
 
** UPV:
 
** UPV:
 
   need a solution till end of February, which needs to be summarized in a CR to the project management.
 
   need a solution till end of February, which needs to be summarized in a CR to the project management.

Revision as of 22:56, 11 December 2007

Meeting Connections

To connect from the outside by phone please do the following

1.) ESNET: 8242553

2.) EVO: Room has been booked for GlueX Weekly meeting

3.) Phone:

+1-800-377-8846 : US

+1-888-276-7715 : Canada

+1-302-709-8424 : International

then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements and Review Status
    • IPR CD-3 22-24 July, 2008
  • Collaboration Meeting in January
  • Reports from Technical Groups
    • Calorimetry
    • Offline Software
    • Tagger & Beamline
  • Detector Updates
    • Beamline & Tagger
    • Solenoid
    • Target
    • Start Counter
    • CDC CDC_12_12_2007
    • FDC
    • BCAL
    • TOF
    • FCAL
    • Electronics
    • Online
    • Offline
    • Monte Carlo
  • Review the R&D reports due in 2008
    • BCAL:
   Measure the light output for cosmic muons with the first
   prototype SiPMT arrays and verify it is above 20 photo electrons.
   Deadline for DOE: 30-Jun-08
    • Tagger:
   Develop a fabrication technique to build a prototype of the tagger
   microscope and couple it to a SiPMT.
   Deadline for DOE: 30-Jun-08
    • Electronics:
   Auxiliary electronics prototyping: Report summarizing the concept
   and prototyping of the clock distribution. The jitter of the clock should
   be below 50ps
   Deadline for DOE: 31-Aug-08
    • FADC:
   Complete fabrication and testing of prototype v1 of the
   master trigger module and collect signals from 2 energy sum modules in
   parallel at 2.5 Gbits/sec
   Deadline for DOE: 31-Aug-08
    • FDC:
   Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
   Verify the wire placement is in +/- 50u.
   Deadline for DOE: 30-Sep-08
    • UPV:
  need a solution till end of February, which needs to be summarized in a CR to the project management.
  The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
  • AOT