Difference between revisions of "2007-12-12"

From GlueXWiki
Jump to: navigation, search
Line 24: Line 24:
  
 
*** BCAL:
 
*** BCAL:
    =====
 
 
     Measure the light output for cosmic muons with the first
 
     Measure the light output for cosmic muons with the first
 
     prototype SiPMT arrays and verify it is above 20 photo electrons.
 
     prototype SiPMT arrays and verify it is above 20 photo electrons.
Line 30: Line 29:
  
 
*** Tagger:
 
*** Tagger:
    =======
 
 
     Develop a fabrication technique to build a prototype of the tagger
 
     Develop a fabrication technique to build a prototype of the tagger
 
     microscope and couple it to a SiPMT.
 
     microscope and couple it to a SiPMT.
Line 36: Line 34:
  
 
*** Electronics:
 
*** Electronics:
    ============
 
 
     Auxiliary electronics prototyping: Report summarizing the concept
 
     Auxiliary electronics prototyping: Report summarizing the concept
 
     and prototyping of the clock distribution. The jitter of the clock should
 
     and prototyping of the clock distribution. The jitter of the clock should
Line 48: Line 45:
  
 
*** FDC:
 
*** FDC:
    =====
 
 
     Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
 
     Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
 
     Verify the wire placement is in +/- 50u.
 
     Verify the wire placement is in +/- 50u.

Revision as of 20:28, 11 December 2007

Meeting Connections

To connect from the outside by phone please do the following

1.) ESNET: 8242553

2.) EVO: Room has been booked for GlueX Weekly meeting

3.) Phone:

+1-800-377-8846 : US

+1-888-276-7715 : Canada

+1-302-709-8424 : International

then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements and Review Status
    • IPR CD-3 22 - 24 July 2008
    • R&D reports for 2008
      • BCAL:
   Measure the light output for cosmic muons with the first
   prototype SiPMT arrays and verify it is above 20 photo electrons.
   Deadline for DOE: 30-Jun-08
      • Tagger:
   Develop a fabrication technique to build a prototype of the tagger
   microscope and couple it to a SiPMT.
   Deadline for DOE: 30-Jun-08
      • Electronics:
   Auxiliary electronics prototyping: Report summarizing the concept
   and prototyping of the clock distribution. The jitter of the clock should
   be below 50ps
   Deadline for DOE: 31-Aug-08
   FADC: Complete fabrication and testing of prototype v1 of the
   master trigger module and collect signals from 2 energy sum modules in
   parallel at 2.5 Gbits/sec
   Deadline for DOE: 31-Aug-08
      • FDC:
   Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
   Verify the wire placement is in +/- 50u.
   Deadline for DOE: 30-Sep-08
  • Reports from Technical Groups
    • Calorimetry
    • Offline Software
    • Tagger & Beamline
  • Collaboration Meeting in January
  • Detector Updates
    • Beamline & Tagger
    • Solenoid
    • Target
    • Start Counter
    • CDC
    • FDC
    • BCAL
    • TOF
    • FCAL
    • Electronics
    • Online
    • Offline
    • Monte Carlo
  • AOT