Difference between revisions of "2007-12-12"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 19: Line 19:
  
 
* Announcements and Review Status
 
* Announcements and Review Status
 +
 +
** IPR CD-3 22 - 24 July 2008
 +
** R&D reports for 2008
 +
 +
*** BCAL:
 +
    =====
 +
    Measure the light output for cosmic muons with the first
 +
    prototype SiPMT arrays and verify it is above 20 photo electrons.
 +
    Deadline for DOE: 30-Jun-08
 +
 +
*** Tagger:
 +
    =======
 +
    Develop a fabrication technique to build a prototype of the tagger
 +
    microscope and couple it to a SiPMT.
 +
    Deadline for DOE: 30-Jun-08
 +
 +
*** Electronics:
 +
    ============
 +
    Auxiliary electronics prototyping: Report summarizing the concept
 +
    and prototyping of the clock distribution. The jitter of the clock should
 +
    be below 50ps
 +
    Deadline for DOE: 31-Aug-08
 +
 +
    FADC: Complete fabrication and testing of prototype v1 of the
 +
    master trigger module and collect signals from 2 energy sum modules in
 +
    parallel at 2.5 Gbits/sec
 +
    Deadline for DOE: 31-Aug-08
 +
 +
*** FDC:
 +
    =====
 +
    Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
 +
    Verify the wire placement is in +/- 50u.
 +
    Deadline for DOE: 30-Sep-08
  
 
* Reports from Technical Groups
 
* Reports from Technical Groups

Revision as of 20:27, 11 December 2007

Meeting Connections

To connect from the outside by phone please do the following

1.) ESNET: 8242553

2.) EVO: Room has been booked for GlueX Weekly meeting

3.) Phone:

+1-800-377-8846 : US

+1-888-276-7715 : Canada

+1-302-709-8424 : International

then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements and Review Status
    • IPR CD-3 22 - 24 July 2008
    • R&D reports for 2008
      • BCAL:
   =====
   Measure the light output for cosmic muons with the first
   prototype SiPMT arrays and verify it is above 20 photo electrons.
   Deadline for DOE: 30-Jun-08
      • Tagger:
   =======
   Develop a fabrication technique to build a prototype of the tagger
   microscope and couple it to a SiPMT.
   Deadline for DOE: 30-Jun-08
      • Electronics:
   ============
   Auxiliary electronics prototyping: Report summarizing the concept
   and prototyping of the clock distribution. The jitter of the clock should
   be below 50ps
   Deadline for DOE: 31-Aug-08
   FADC: Complete fabrication and testing of prototype v1 of the
   master trigger module and collect signals from 2 energy sum modules in
   parallel at 2.5 Gbits/sec
   Deadline for DOE: 31-Aug-08
      • FDC:
   =====
   Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
   Verify the wire placement is in +/- 50u.
   Deadline for DOE: 30-Sep-08
  • Reports from Technical Groups
    • Calorimetry
    • Offline Software
    • Tagger & Beamline
  • Collaboration Meeting in January
  • Detector Updates
    • Beamline & Tagger
    • Solenoid
    • Target
    • Start Counter
    • CDC
    • FDC
    • BCAL
    • TOF
    • FCAL
    • Electronics
    • Online
    • Offline
    • Monte Carlo
  • AOT