Line 19: Line 19:
  
 
* Announcements and Review Status
 
* Announcements and Review Status
 +
** IPR CD-3 22-24 July, 2008
  
* Reports from Technical Groups
+
* Collaboration Meeting in January [[GlueX-Collaboration-Jan-2008]]
  
** Calorimetry: November 23, 2007 Calorimetry  
+
* Reports from Technical Groups
 +
** Calorimetry  
 
** Offline Software
 
** Offline Software
 
** Tagger & Beamline  
 
** Tagger & Beamline  
 
* Collaboration Meeting in January
 
  
 
* Detector Updates
 
* Detector Updates
 
 
** Beamline & Tagger
 
** Beamline & Tagger
 
** Solenoid
 
** Solenoid
 
** Target
 
** Target
 
** Start Counter
 
** Start Counter
** CDC  
+
** CDC [[CDC_12_12_2007]]
 
** FDC
 
** FDC
** BCAL
+
** BCAL [http://www.jlab.org/Hall-D/software/wiki/index.php/BCAL_SiPM_Tests_2007#JLab A20H SiPM Tests], [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=926 SiPM-array tests under Phase I]
 
** TOF
 
** TOF
 
** FCAL
 
** FCAL
** Electronics
+
** Electronics: establish Hall-D electronics pool
 
** Online
 
** Online
 
** Offline
 
** Offline
** Monte Carlo
+
** Monte Carlo [[Status Report on CD3 simulation geometry]]
 +
** DAQ & Trigger
 +
** Calibration
 +
 
 +
* Review the R&D reports due in 2008
 +
** BCAL:
 +
    Measure the light output for cosmic muons with the first
 +
    prototype SiPMT arrays and verify it is above 20 photo electrons.
 +
    Deadline for DOE: 30-Jun-08
 +
** Tagger:
 +
    Develop a fabrication technique to build a prototype of the tagger
 +
    microscope and couple it to a SiPMT.
 +
    Deadline for DOE: 30-Jun-08
 +
** Electronics:
 +
    Auxiliary electronics prototyping: Report summarizing the concept
 +
    and prototyping of the clock distribution. The jitter of the clock should
 +
    be below 50ps
 +
    Deadline for DOE: 31-Aug-08
 +
**  FADC:
 +
    Complete fabrication and testing of prototype v1 of the
 +
    master trigger module and collect signals from 2 energy sum modules in
 +
    parallel at 2.5 Gbits/sec
 +
    Deadline for DOE: 31-Aug-08
 +
** FDC:
 +
    Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
 +
    Verify the wire placement is in +/- 50u.
 +
    Deadline for DOE: 30-Sep-08
 +
** UPV:
 +
  need a solution till end of February, which needs to be summarized in a CR to the project management.
 +
  The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
 +
 
 +
* Review of action items listed in action item tracker at http://www.jlab.org/~elke/ActionItemTrackerHallD.xls 
  
* AOT
+
* AOT: meetings between Xmas and New Year on the Portal's Calendar?

Latest revision as of 17:12, 24 February 2017

Meeting Connections

To connect from the outside by phone please do the following

1.) ESNET: 8242553

2.) EVO: Room has been booked for GlueX Weekly meeting

3.) Phone:

+1-800-377-8846 : US

+1-888-276-7715 : Canada

+1-302-709-8424 : International

then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements and Review Status
    • IPR CD-3 22-24 July, 2008
  • Reports from Technical Groups
    • Calorimetry
    • Offline Software
    • Tagger & Beamline
  • Review the R&D reports due in 2008
    • BCAL:
   Measure the light output for cosmic muons with the first
   prototype SiPMT arrays and verify it is above 20 photo electrons.
   Deadline for DOE: 30-Jun-08
    • Tagger:
   Develop a fabrication technique to build a prototype of the tagger
   microscope and couple it to a SiPMT.
   Deadline for DOE: 30-Jun-08
    • Electronics:
   Auxiliary electronics prototyping: Report summarizing the concept
   and prototyping of the clock distribution. The jitter of the clock should
   be below 50ps
   Deadline for DOE: 31-Aug-08
    • FADC:
   Complete fabrication and testing of prototype v1 of the
   master trigger module and collect signals from 2 energy sum modules in
   parallel at 2.5 Gbits/sec
   Deadline for DOE: 31-Aug-08
    • FDC:
   Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
   Verify the wire placement is in +/- 50u.
   Deadline for DOE: 30-Sep-08
    • UPV:
  need a solution till end of February, which needs to be summarized in a CR to the project management.
  The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
  • AOT: meetings between Xmas and New Year on the Portal's Calendar?