Line 72: Line 72:
 
==Detector Updates==
 
==Detector Updates==
  
===beamline and tagger===
+
===Beamline and Tagger===
  
 
* Elke: design contract for tagger to go to procurement soon
 
* Elke: design contract for tagger to go to procurement soon
Line 79: Line 79:
 
* Tim: sample for tagger interface drawing will be sent this week
 
* Tim: sample for tagger interface drawing will be sent this week
  
===solenoid===
+
===Solenoid===
  
Elke reported items from George:
+
Elke reported items from George B.:
  
 
* coil 3 looks worse that we thought
 
* coil 3 looks worse that we thought
Line 88: Line 88:
 
* we have started testing coils at JLab
 
* we have started testing coils at JLab
  
===target===
+
===Target===
  
 
Tim reported on yesterday's meeting.
 
Tim reported on yesterday's meeting.
Line 100: Line 100:
 
* discussion cryogenics: independent system or use magnet system
 
* discussion cryogenics: independent system or use magnet system
  
===start counter===
+
===Start Counter===
  
 
Werner reported on discussions of geometry. Some items:
 
Werner reported on discussions of geometry. Some items:
Line 131: Line 131:
 
* The combined FDC/CDC/tracking meeting TBA
 
* The combined FDC/CDC/tracking meeting TBA
  
===bcal===
+
===BCAL===
  
zisis
+
Zisis gave the report:
cosmics with sipm on bcal
+
monte carlo work continuing
+
george working on statement of work for sipm's
+
question for elke, test fibers have been ordered for S, kurai this week
+
might be two months to get them without some special effort or arrangement
+
  
===tof===
+
* Tests with cosmics with SiPM's on the BCAL continue.
 +
* Monte Carlo work continuing
 +
* George L. is working on the statement of work for the SiPM's
 +
* Elke and Carl: test fibers have been ordered from S???. The order from Kurai should go out this week.
 +
** Carl: it might be two months to get them without some special effort or arrangement
  
beni
+
===FCAL===
nothing to report
+
  
===fcal===
+
Beni gave the report:
  
beni
+
* The test set-up for the plastic wall for holding PMT's has been constructed.
test stand set-up for plastic wall for holding pmt's, test heat tolerance
+
* There will be a CD3 preparation meeting Friday at 8:30 am.
8:30 fri. cd3 preparation meeting
+
* He will be getting NIM electronics from an IUCF transportainer. He hopes they work.
will get nim electronics from IUCF transportainer
+
* Zisis: George L. has asked about beamlines at TRIUMF for tests
george asked about beamlines at triumf for testing
+
** a beamline available
beamline available
+
** need two month notice to get time on it
need two month notice
+
** the 8x8 block FCAL test is a candidate
8x8 block fcal test
+
** electronics/read-out system must come with the experimenters; none will be provided
electronics must come with experimenters
+
* He has made inquiries about Russian rad-hard lead glass blocks
russion radhard lead glass blocks
+
** 1 block for $260
1 block for 260$ limited accuracy in dimensions 2mm tolerance
+
** limited accuracy in dimensions: 2 mm tolerance
  
===calibration===
+
===Calibration===
  
christina
+
Christina reported:
collecting components for a prototype system
+
* They are collecting components for a prototype system.
discussion with company for purchasing LED drivers
+
* They have initiated discussions with a company for purchasing LED drivers.
have some tiny LED's to start with
+
* They have some tiny LED's they will use to begin work.
  
===electronics===
+
===Electronics===
  
pre-amp cards, cables connectectors done this week, for FDC and CDC
+
Fernando reported:
assembled and remain to be tested
+
FADC 250 MHz is in good shape, FCAL and BCAL to provide trigger
+
  
===online===
+
* Pre-amp cards, cables and connectors for the FDC and CDC will be done this week.
 
+
** They are assembled; testing remains to be done.
Elliott not here
+
* The 250 MHz FADC is in good shape.
 
+
===offline===
+
 
+
DAvid l
+
nothgint to report
+
  
 
===Monte Carlo===
 
===Monte Carlo===
  
Richard
+
Richard reported on the new geometry. See his [[Status Report on CD3 simulation geometry|wiki page]] for details.
new geometry
+
He remarked in several items:
space between stereo and axial apckages
+
* The space between stereo and axial packages in both versions may be able to be reduced.
endplate material dominiated by endplug, needs to be modeled propersly
+
* The "endplate" material of the CDC is actually dominiated by the endplugs for the straws. These plugs need to be modeled properly; this is not the case presently.
questions about bcal details
+
* He requested feedback on BCAL geometry details.

Revision as of 18:39, 28 November 2007

Meeting Time and Place

  • Location:
  • ESNET: 8242553
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • Enter Code: 39527048#
  • Time: 10:00am EST

Agenda

Minutes

Present:

  • JLab: Tim, Simon, Dave L., Carl, Eugene, Mark, John D., Dan, Elke, Claus, Dave D., Fernando
  • UConn: Richard
  • IUCF: Gerard
  • CMU: Curtis, Yves
  • Athens: Christine

Announcements

Elke had a few:

  • JLab in a hiring freeze at present
  • Next week, Monday trought Friday, is the EVMS review
    • cost account managers will make presentations
    • physics is scheduled for Wednesday morning

Elke proposed that we drop our meeting for next week. All agreed.

R&D Contracts

Elke reported on this item.

  • Work proceeds in conjuction with JLab Procurement
  • Several contracts that ran from 2002 to 2007 have to be re-visited
  • These include IUCF and Regina - The Regina one has been dealt with: second last invoice has been sent, last one will be after Phase-1 close out before the end of the year
  • Most likely these contracts will be closed and re-open with new ones.
  • Elke has list of all known contracts
    • It is an Excel spreadsheet
    • She will send it around soon.

Report from Calorimetry Technical Group

Zisis reported on items from the last meeting of the group. See his minutes for details.

Tim will send something[???} to the machine shop today.

Detector Updates

Beamline and Tagger

  • Elke: design contract for tagger to go to procurement soon
    • will be reviewed by accelerator division
  • Elke: documents on the wiki are near up-to-date
  • Tim: sample for tagger interface drawing will be sent this week

Solenoid

Elke reported items from George B.:

  • coil 3 looks worse that we thought
    • will completely open and replace some tubing
    • there are some contract issues with IUCF to be sorted out (see above)
  • we have started testing coils at JLab

Target

Tim reported on yesterday's meeting.

  • reviewed tracking list
  • temporary solid target discussed (for sue during startup)
  • specification to-do list reviewed
  • discussion of racks for the gas system, gas system itself, were discussed
  • discussion of alignment accuracies
  • discussion of thermometry
  • discussion cryogenics: independent system or use magnet system

Start Counter

Werner reported on discussions of geometry. Some items:

  • overall dimensions, stay-in zone
  • target independent of start counter desired
  • 2004 geometry for counters themselves still looks good with current rate estimates

CDC

Yves gave a detailed report on recent progress at CMU. See his status reports (1, 2) on the web for details.

Gerard had some concerns about cabling and grounding based on the photograph of the prototype. He will talk with Yves offline.

Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU electronics in advance of the trip.

FDC

Dan gave the report:

  • Procurement of the wire winding contract is waiting on final budget from IUCF
  • Composite wire frames are being produced. Brian will have five by next week.
    • construction is more accurate with new jig
  • Test Lab set-up being put back together. Denny Insley is helping.
  • another offer of new space for FDC's downstairs in CEBAF Center has materialized
    • Brian also has space in the EEL.
    • Space in the clean room being discussed with Jack Segal
  • Interposer/daughter boards have not yet been transferred from Fernando. FDC group not quite ready to test them yet.
  • There will be an FDC meeting tomorrow; agenda has been circulated
  • The combined FDC/CDC/tracking meeting TBA

BCAL

Zisis gave the report:

  • Tests with cosmics with SiPM's on the BCAL continue.
  • Monte Carlo work continuing
  • George L. is working on the statement of work for the SiPM's
  • Elke and Carl: test fibers have been ordered from S???. The order from Kurai should go out this week.
    • Carl: it might be two months to get them without some special effort or arrangement

FCAL

Beni gave the report:

  • The test set-up for the plastic wall for holding PMT's has been constructed.
  • There will be a CD3 preparation meeting Friday at 8:30 am.
  • He will be getting NIM electronics from an IUCF transportainer. He hopes they work.
  • Zisis: George L. has asked about beamlines at TRIUMF for tests
    • a beamline available
    • need two month notice to get time on it
    • the 8x8 block FCAL test is a candidate
    • electronics/read-out system must come with the experimenters; none will be provided
  • He has made inquiries about Russian rad-hard lead glass blocks
    • 1 block for $260
    • limited accuracy in dimensions: 2 mm tolerance

Calibration

Christina reported:

  • They are collecting components for a prototype system.
  • They have initiated discussions with a company for purchasing LED drivers.
  • They have some tiny LED's they will use to begin work.

Electronics

Fernando reported:

  • Pre-amp cards, cables and connectors for the FDC and CDC will be done this week.
    • They are assembled; testing remains to be done.
  • The 250 MHz FADC is in good shape.

Monte Carlo

Richard reported on the new geometry. See his wiki page for details. He remarked in several items:

  • The space between stereo and axial packages in both versions may be able to be reduced.
  • The "endplate" material of the CDC is actually dominiated by the endplugs for the straws. These plugs need to be modeled properly; this is not the case presently.
  • He requested feedback on BCAL geometry details.