Difference between revisions of "2007-11-28"

From GlueXWiki
Jump to: navigation, search
(more formatting)
Line 66: Line 66:
 
==Report from Calorimetry Technical Group==
 
==Report from Calorimetry Technical Group==
  
zisis link to meeting page, minutes posted there
+
Zisis reported on items from the last meeting of the group. See his [[November 23, 2007 Calorimetry|minutes]] for details.
tim will send something to the machine shop today
+
  
==detector updates==
+
Tim will send something[???} to the machine shop today.
 +
 
 +
==Detector Updates==
  
 
===beamline and tagger===
 
===beamline and tagger===
  
design contract for tagger to procurement soon
+
* Elke: design contract for tagger to go to procurement soon
will be reviewed by acc division
+
** will be reviewed by accelerator division
documents on the wiki are near up-to-date
+
* Elke: documents on the wiki are near up-to-date
sampling of tagger interface drawing will be sent this week, tim
+
* Tim: sample for tagger interface drawing will be sent this week
  
 
===solenoid===
 
===solenoid===
  
coil 3 looks worse that we thought. completely open and replace some tubing, george. contract things to be sorted out
+
Elke reported items from George:
started testing coils at jlab
+
 
 +
* coil 3 looks worse that we thought
 +
** will completely open and replace some tubing
 +
** there are some contract issues with IUCF to be sorted out (see above)
 +
* we have started testing coils at JLab
  
 
===target===
 
===target===
  
tim meeting yesterday, reviewed tracking list, temporary solid target discussed for startup
+
Tim reported on yesterday's meeting.
specification work to do reviewed
+
 
racks for gas system, system itself
+
* reviewed tracking list
alignment accuracies
+
* temporary solid target discussed (for sue during startup)
thermometry
+
* specification to-do list reviewed
cryogenics: independent system or use magnet system
+
* discussion of racks for the gas system, gas system itself, were discussed
 +
* discussion of alignment accuracies
 +
* discussion of thermometry
 +
* discussion cryogenics: independent system or use magnet system
  
 
===start counter===
 
===start counter===
  
werner
+
Werner reported on discussions of geometry. Some items:
discussion started: geometry
+
 
overall dimensions, stay-in zone  
+
* overall dimensions, stay-in zone  
target independent of start counter desired
+
* target independent of start counter desired
2004 geometry for counters itself still looks good with current rate estimates
+
* 2004 geometry for counters themselves still looks good with current rate estimates
  
 
===CDC===
 
===CDC===
  
Yves
+
Yves gave a detailed report on recent progress at CMU. See his status reports ([[CDC_21_11_2007|1]],  [[CDC_28_11_2007|2]]) on the web for details.
reviewed status report on web
+
 
Gerard had some concerns about cabling and grounding. will talk with Yves
+
Gerard had some concerns about cabling and grounding based on the photograph of the prototype. He will talk with Yves offline.
Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU hardware in advance of the trip.
+
 
 +
Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU electronics in advance of the trip.
  
 
===FDC===
 
===FDC===
  
Dan
+
Dan gave the report:
procurement wire winding work, waiting on final budget from IUCF
+
 
composite wire frames, brian will have five by next week
+
* Procurement of the wire winding contract is waiting on final budget from IUCF
construction more accurate with new jig
+
* Composite wire frames are being produced. Brian will have five by next week.
test lab set-up being put back together denny i is helping
+
** construction is more accurate with new jig
another offer of new space for fdc's downstairs in CC
+
* Test Lab set-up being put back together. Denny Insley is helping.
brian has space in eel.
+
* another offer of new space for FDC's downstairs in CEBAF Center has materialized
space in clean room being discussed with Jack Segal
+
** Brian also has space in the EEL.
interposer/daughter boards has not yet been transferred from Fernando, not quite ready to test them yet
+
** Space in the clean room being discussed with Jack Segal
FDC meeting tomorrow, agenda has been circulated
+
* Interposer/daughter boards have not yet been transferred from Fernando. FDC group not quite ready to test them yet.
combined FDC/CDC tracking meeting TBA
+
* There will be an FDC meeting tomorrow; agenda has been circulated
 +
* The combined FDC/CDC/tracking meeting TBA
  
 
===bcal===
 
===bcal===

Revision as of 18:16, 28 November 2007

Meeting Time and Place

  • Location:
  • ESNET: 8242553
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • Enter Code: 39527048#
  • Time: 10:00am EST

Agenda

Minutes

Present:

  • JLab: Tim, Simon, Dave L., Carl, Eugene, Mark, John D., Dan, Elke, Claus, Dave D., Fernando
  • UConn: Richard
  • IUCF: Gerard
  • CMU: Curtis, Yves
  • Athens: Christine

Announcements

Elke had a few:

  • JLab in a hiring freeze at present
  • Next week, Monday trought Friday, is the EVMS review
    • cost account managers will make presentations
    • physics is scheduled for Wednesday morning

Elke proposed that we drop our meeting for next week. All agreed.

R&D Contracts

Elke reported on this item.

  • Work proceeds in conjuction with JLab Procurement
  • Several contracts that ran from 2002 to 2007 have to be re-visited
  • These include IUCF and Regina - The Regina one has been dealt with: second last invoice has been sent, last one will be after Phase-1 close out before the end of the year
  • Most likely these contracts will be closed and re-open with new ones.
  • Elke has list of all known contracts
    • It is an Excel spreadsheet
    • She will send it around soon.

Report from Calorimetry Technical Group

Zisis reported on items from the last meeting of the group. See his minutes for details.

Tim will send something[???} to the machine shop today.

Detector Updates

beamline and tagger

  • Elke: design contract for tagger to go to procurement soon
    • will be reviewed by accelerator division
  • Elke: documents on the wiki are near up-to-date
  • Tim: sample for tagger interface drawing will be sent this week

solenoid

Elke reported items from George:

  • coil 3 looks worse that we thought
    • will completely open and replace some tubing
    • there are some contract issues with IUCF to be sorted out (see above)
  • we have started testing coils at JLab

target

Tim reported on yesterday's meeting.

  • reviewed tracking list
  • temporary solid target discussed (for sue during startup)
  • specification to-do list reviewed
  • discussion of racks for the gas system, gas system itself, were discussed
  • discussion of alignment accuracies
  • discussion of thermometry
  • discussion cryogenics: independent system or use magnet system

start counter

Werner reported on discussions of geometry. Some items:

  • overall dimensions, stay-in zone
  • target independent of start counter desired
  • 2004 geometry for counters themselves still looks good with current rate estimates

CDC

Yves gave a detailed report on recent progress at CMU. See his status reports (1, 2) on the web for details.

Gerard had some concerns about cabling and grounding based on the photograph of the prototype. He will talk with Yves offline.

Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU electronics in advance of the trip.

FDC

Dan gave the report:

  • Procurement of the wire winding contract is waiting on final budget from IUCF
  • Composite wire frames are being produced. Brian will have five by next week.
    • construction is more accurate with new jig
  • Test Lab set-up being put back together. Denny Insley is helping.
  • another offer of new space for FDC's downstairs in CEBAF Center has materialized
    • Brian also has space in the EEL.
    • Space in the clean room being discussed with Jack Segal
  • Interposer/daughter boards have not yet been transferred from Fernando. FDC group not quite ready to test them yet.
  • There will be an FDC meeting tomorrow; agenda has been circulated
  • The combined FDC/CDC/tracking meeting TBA

bcal

zisis cosmics with sipm on bcal monte carlo work continuing george working on statement of work for sipm's question for elke, test fibers have been ordered for S, kurai this week might be two months to get them without some special effort or arrangement

tof

beni nothing to report

fcal

beni test stand set-up for plastic wall for holding pmt's, test heat tolerance 8:30 fri. cd3 preparation meeting will get nim electronics from IUCF transportainer george asked about beamlines at triumf for testing

beamline available
need two month notice
8x8 block fcal test
electronics must come with experimenters

russion radhard lead glass blocks

1 block for 260$ limited accuracy in dimensions 2mm tolerance

calibration

christina collecting components for a prototype system discussion with company for purchasing LED drivers have some tiny LED's to start with

electronics

pre-amp cards, cables connectectors done this week, for FDC and CDC assembled and remain to be tested FADC 250 MHz is in good shape, FCAL and BCAL to provide trigger

online

Elliott not here

offline

DAvid l nothgint to report

Monte Carlo

Richard new geometry space between stereo and axial apckages endplate material dominiated by endplug, needs to be modeled propersly questions about bcal details