FCAL2 Readiness Review
Location
Date: February 14, 2025
Time: 9 am EST
Room: L102 (CEBAF center)
- For remote connections: Zoom Meeting Connection information
Experiments: E12-12-002 and E12-12-002A
Charge [1]
Committee members: Stepan Stepanyan (chair), Sergey Boyarinov (DAQ/Trigger), Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan
ERR Agenda
8:45-9:00: Executive session
9:00-9:45: Status of the ECAL commissioning (25+20) A. Somov (addressing charges 1, 2, 3, 5, and 6)
9:45-10:15: Status of the FCAL part (15+15) M. Albrecht (addressing charges 1, 3, and 6)
10:15-10:30 Coffee break
10:30-11:00: Engineering design of the detector frame and cooling system (15+15) T. Whitlatch (addressing charge 2)
11:00-11:30: "Integration of the ECAL into the GlueX framework (15+15) A. Somov (addressing charge 4)
11:30-12:00: Shower reconstruction and FCAL2 detector calibration (15+15) S. Taylor (addressing charge 5)
12:00-12:30 (tentative) : Executive session
12:30: (tentative) Closeout
Documentation
Supplementary Material
- CCAL performance and FCAL2 module design, Nucl.Instrum.Meth.A 1013 (2021) 165683
- NIM paper on the crystal properties, Nucl.Instrum.Meth.A 956 (2020) 163375
- Lead tungstate calorimeter of the Jefferson Lab Eta Factory experiment, Proceedings of the CALOR 2024 conference
- A new active base of photomultiplier R4125 designed for the lead tungstate calorimeter, Presented at the 2024 IEEE NSS MIC conference
- The GlueX beamline and detector, Nucl.Instrum.Meth.A 987 (2021) 164807