Calorimeter Review
From GlueXWiki
Revision as of 09:33, 14 May 2008 by Cmeyer (Talk | contribs) (→The Hall D Calorimeter Final Design and Safety Review)
Contents
The Hall D Calorimeter Final Design and Safety Review
- [1] Charge, Agenda, Reviewers]
- Review Documents
- P3e Schedule
- Final Report
- Previous Reviews
Material Prepared for the Review
- Prebrief material for the review.
- GlueX-doc-985 Physics and Calorimeter Performance Metrics
- GlueX-doc-986 BCAL: Barrel Calorimeter]
- GlueX-doc-987 SiPM for BCAL
- GlueX-doc-988 FCAL: Forward Calorimeter
- GlueX-doc-989 Calorimeter Simulations
- Final versions of talks.
- GlueX-doc-968 BCAL: Presentation
- GlueX-doc-983 FCAL: Presentation
- GlueX-doc-984 Calorimeter Simulation
Relevant Wiki Pages
- Description BCAL
- Description FCAL
- Description Electronics
- Description Calibration-Monitoring
- Safety/QA documentation ESH&Q
Dry Run Schedule for the Review
- First round of dry runs (week of 4th of February)
- Second round of dry runs (week of 11th of February) TENTATIVE
- Pre-brief Material. Due Feb 11 to reviewers.
- Calorimeter Document
- Drawings
- Other?
- Final talks to Elke: 17th of February.
- Review: Feb 19 and 20.
- issues that need special attention