June 4, 2014 Calibration
From GlueXWiki
GlueX Calibration Meeting
Wednesday, June 4, 2014
11:00 am, EDT
JLab: CEBAF Center, F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 630804895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/630804895.
- To join via phone, use one of the following numbers and the Conference ID: 630804895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Status Update
- CCDB update
- Constants_to_Review
- Tracking
- Calorimetry
- Other systems
- Simulations and Calibrations
Minutes
- Status Update
- There is a new CCDB release that treats 1D row-wise and column-wise tables in the same manner. Sean has verified that it works, once he found out that GetCalib() returns false when the table is correctly loaded (!).
- Sean is doing some final sanity checks and will check in his first round of changes in the next couple days. These will depend on the new CCDB version.
- Sean updated the Constants_to_Review page. This can serve as a list for the various groups over the summer to update based on their first data. A few old lines of code have already been taken care of. Review of the geometry classes used in reconstruction is ongoing.
- Tracking
- Calorimetry
- Zisis and Sean will keep in touch to develop a plan for updating the BCAL calibrations as manpower is available.
- Eugene asked about the plan to analyze FCAL cosmic data. Matt needs to be asked about this.
- Simulations and Calibrations
- Work at NU is stalled due to cluster problems.