Controls Meeting 20-Mar-2014
From GlueXWiki
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 6-Mar-2014
- UPS requirements for Hall D (Dave, Yi, Hovanes)
- BCAL power supply interlocks (Dave)
- PLC archiving
- Radiator insertion stage test (Hovanes, Yi)
- Suggested modifications to BCAL and FDC voltage software (Elton, others)
- Any other business
Time/Location
9:30AM Thurs 20-Mar-2014 CC A110
Minutes
UPS Requirements
- Dave collected the information from Jonathan regarding the power for the valves
- Yi would like to have the PXI system on the UPS as well (rated 300W)
- Hovanes showed the layout of the UPS requirements in Hall D (PXI was missing). Hovanes will send the requirements to Joe Beaufait on Friday.
BCAL power supply interlocks
- Dave showed slides explaining his work on the BCAL interlocks.
- Encountered strange problem that the 5V output modules on PoinIO did not provide enought current for the MPOD interlock input.
- Dave will order CompactLogix extension modules to avoid PintIO all together, and use CompactLogix modules.
- There was a request to change the button labels to adhere to Elton's convention.