DAQ
- Initial readout of pedestals (3 crates)
- Install remaining CPUs
- Readout FADC and F1 TDC crates
Power MPPCs
- Connection to network
- Connect chillers (power and connections to manifold)
- Install rotometers on upstream and downstream
Slow Controls
- Read back T and Humidity upstream
- Read back T and Humidity downstream
- Read back of RTDs on cooling plates upstream
- Read back of RTDs on cooling plates downstream
- Install interlock of chiller and MPPC power to humidity and temperature signals
LED monitoring
- Replace translation boards with correct assignment
- Install MOD crate
- Complete cabling to crate
- Connect MPOD and VME crates to network