Solenoid Meeting 2014-02-11
From GlueXWiki
Attendees
George B., David B., Mark S., Yi Q.
Minutes
Task List
- PXI ground jumpers: installed
- LHe level probe: Scot received wiring diagram from cryo group, will verify the connection
- HW QD balance resistor: file still missing, will find more places including a local machine
- Ground Fault Detector signal to PXI: connected
- Power supply spare: Mark will help look into it
- Control of Solenoid from Counting House: HMI & EPICS, start thinking, will breakdown sub-items later
- Short sample tests at Twenty University: George will push it
- Incorporate PLC into Operator alarm system: Yi will look into it
- Auto log entries: start thinking, may proceed with event-triggered entries