BLTWG Meeting 09/16/2013
From GlueXWiki
Organization
- Time: 11:30 EST
- Place: ESNET and Seevogh (Jlab community)
- Connecting: instructions are here
- Present: Natalie W., Jarrod F., Eugene C., Todd S., Ivan T., Tim W., Yi Q., Brenden P., Alex B., Ann C., James M., Curtis M., Franz K.
Agenda
- Announcements
- October Collaboration Meeting
- Update on mapping - Tim W.
- Update on pair spectrometer - Ivan T.
- TAGH counter inspection and testing - Franz K./Natalie W.
- Update on goniometer testing - Yi Q.
- Update on clock signal - Eugene C.
- Update on microscope electronics - Alex B.
- Status of the microscope construction - James M.
- Diamond thinning proposal - Brenden/Jarrod F.
- any other business
Minutes
- Mapping - Tim
- preparing mapping instrument for tagger magnet
- repairing power supply for the pair spectrometer's magnet
- Pair spectrometer - Ivan
- all parts are ready except for the fixture of the fibers, working with Chuck on design
- working on slow control
- Fixed array - Natalie/Franz
- received all scintillator bars with light guide glued
- checked all of them, most of them are good
- working on final design of the holder
- Goniometer - Yi
- testing goniometer in FEL
- verified minimum step sized: 0.2 mdeg in yaw and 0.1 mdeg in pitch
- more test on reproducibility and optimize moving parameters
- Accelerator Clock - Eugene
- going to order cable for the signal form physics's FY14 budget: 26M for part and 14M for labor
- Microscope - Alex B.
- production on track, will ship samples to JLab soon
- Microscope construction - James
- a little bit late on first article, but the whole schedule and budget are still on track
- Diamond thinning - Brenden/Jarrod
- restarting the thinning process
- Jarrod working with Richard on the proposal