Minutes-3-7-2013
From GlueXWiki
March 7, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Spare parts
- Package #2 status
- Package #3 repair
- Rebaselining update [1](Lubomir)
- Installation schedule
- Engineering (Bill)
- Manifold installation
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other