Apr 18, 2013 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 18:03, 14 February 2013 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == == Tentative Agenda == # Announcements # Action Items # Light guides (Elton) # Schedule for production and testing (all) # SiPM produ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Action Items from previous meetings

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Light guides (Elton)
  4. Schedule for production and testing (all)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)

Minutes

Attending: