Aug 23, 2011 SiPM Electrical and Cooling
From GlueXWiki
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Clarify option of purchase of additional SiPMs (Elton)
- Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
- Order micro Dsub connectors to make connections to the monitoring control board (Chris)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup
Minutes
Attending: