July 26, 2011 SiPM Electrical and Cooling
From GlueXWiki
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
-
Check into AC units based on Peltier coolers for SiPM production tests (Fernando)See - * [1] and [2]
-
Review Fcal LED and controller monitoring boards (Fernando) -
Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) -
Complete molds for wrapping and order forms (Jim)Elton to test wrapping forms. -
Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this) -
Cooling tubes need to be brazed in (Jim?)Bending and brazing tubes in progress -
Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup
Minutes
Attending: Elton, Fernando, Yi, Chris, Nick, Scot
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Light guide schedule: Two sets are promised for shipping tomorrow. Once in production, USM expects to be able to produce many sets per week.
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup