Nov 17, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 08:35, 11 November 2011 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Jack to update board with bias compensation circuitry (Jack)
  2. Check on status of shipping of bcal slices (Elton)
  3. Elton to send monitoring specification to Jim.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Programming
    6. Other?
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: