Action Items from previous meetings

  1. Add hardware voltage limits to bias circuit (Jack)
  2. Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (Carl and Yi)
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: