Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 10-Jun-2011 9:30 am ARC 231


Agenda

  • Lessons learned from Coil 3
    • what do we need to change for coil 2?
  • Coil 2 status
    • installation and cooldown timeline
    • coil inductances and quench detector
    • Danfysik fault sequencer and slow dump
    • additional PLC and HMI programming
    • fast DAQ
    • anything else?
  • Documentation
    • trip chains
    • anything else
  • Will there be any auxiliary tests?
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • IRMIS at JLab
    • filled with BNL "training" data
  • Preparing for moving into the hall