Minutes-8-5-2010
From GlueXWiki
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- equipment/materials needed for the production
- Electronics: update (Fernando)
- Engineering
- Cathode foil: flex soldering/gluing, procurement status (Roger) [3M conductive film]
- Mylar window thickness
- Wire stringing update (Bill)
- Full-scale prototype tests
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other