April 8, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space
[http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
- Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
- Updates on the redesigns
- finalizing the PCB design
[http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]
- Cathode redesign
- results from the tests of the new frame prototype
- Full scale prototype
- three-layer HV tests (Beni)
- preparation for cosmics tests
- Other