BLTWG Meeting 06/29/2009
From GlueXWiki
- Time: 11:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: R. Jones, Alex S., P. Androzewicz, E. Minges, and T. Whitlatch.
Agenda
- Preparation for the internal tagger review - Tim
- Meeting with BNL diamond working group - Richard
- Microscope prototype progress report from UConn - Richard
- Plans for pair spectrometer magnet work - Erik
- Simulations update + cave backgrounds - Sasha
- Funding needs for diamond work + other - discussion
- Discussion of ideas for MRI proposal - discussion
- Tasks to complete before Lehmann Review - discussion
Notes
-
- collaborate with BNL to bring a 30D72 magnet on loan
from BNL to Jlab.
- coordinate an engineering effort to modify the gap size of
the magnet in order to fit the experimental configuration.
- conduct Monte Carlo simulation for the Pair Spectrometer
detector design.
- develop and construct Pair Spectrometer detectors.
- participate in the Pair Spectrometer detector testing,
installation, commissioning, calibration and maintenance.