June 25, 2009 Calorimetry
From GlueXWiki
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Documentation on fiber first-article
- Review calibration procedures
- Update cost estimates
- light guides (USM)
- temperature stabilization (Tim and Fernando)
- summing circuits for SiPMs (Fernando)
- Impact of gain variations on resolution (especially for summed SiPMs) (Elton)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- FCAL Update
- BCAL Fabrication
- Contract status
- Construction prototype update
- Fiber QA: Media:AttenLen_JS001-8_Prelim.png
- Fiber measurements (Andrei)
- BCAL Readout
- Update from USM (Will)
- Report from Alam/Sergey: Measurements of the effect of cooling on SensL SiPMs
- Cost comparisons (Elton)
- Discussion of Bcal Readout Review (July 21)
- Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
- Other reviewers?
- Agenda
- Update from USM (Will)
- Simulations
- Quick look at Fluka results (Elton)
- Energy deposition in the BCAL layers for PYTHIA events Media:sector_response.pdf
Minutes
Attendees: