JEF meeting, April 25, 2025

From GlueXWiki
Revision as of 09:05, 25 April 2025 by Somov (Talk | contribs) (Agenda)

Jump to: navigation, search

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • HV module disconnected from the EPICS control
    • Bad flash ADC for reference PMTs
    • Low-level histograms [1]
    • Adjusting high voltages (based on the run period 10, iteration 0) [2]
    • Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [3]. Suspicious modules after the accelerator maintenance day
  • Calibrations
    • Initial HV settings using Compton scattering events [4]
    • Pi0 calibration page [5]
      • Pi0s are clearly seen for most ECAL modules (except in the innermost ring)
  • Monitoring
  • Restoring PS test setup [6]
    • The prototype has been assembled and tested. Ready for installing in Hall D
      • Move it to the Hall on Wednesday next week (?)