JEF meeting, April 25, 2025
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- HV module disconnected from the EPICS control
- Bad flash ADC for reference PMTs
- Low-level histograms [1]
- Adjusting high voltages [2] (based on the run period 10, iteration 0)
- Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [3]. Suspicious modules after the accelerator maintenance day
- Calibrations
- Monitoring
- Restoring PS test setup [6]
- The prototype has been assembled and tested. Ready for installing in Hall D
- Move it to the Hall on Wednesday next week (?)
- The prototype has been assembled and tested. Ready for installing in Hall D