JEF meeting, April 25, 2025

From GlueXWiki
Revision as of 08:51, 25 April 2025 by Somov (Talk | contribs)

Jump to: navigation, search

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • HV module disconnected from the EPICS control
    • Bad flash ADC for reference PMTs
    • Low-level histograms [1]
    • Adjusting high voltages [2]
  • Calibrations
    • Initial setting of HVs using Compton scattering events
    • Pi0 calibration page [3]
  • Monitoring
  • Restoring PS test setup [4]