JEF meeting, April 18, 2025

From GlueXWiki
Revision as of 10:30, 21 April 2025 by Somov (Talk | contribs)

Jump to: navigation, search

Meeting time and location:

  • ECAL maintenance and performance during the run
    • ECAL scalers before the accelerator maintenance day [1]
    • Checking ECAL modules [2]
    • Issue with the FCAL HV module [3]
    • Flash ADC scalers during first beam [4]
    • Two modules fixed during the accelerator maintenance day [5]
      • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [6]
    • Commissioning of the ECAL trigger [7] [8]
    • Issues with the readout crate during two first two production nights [9]
  • Calibrations
    • First look at Compton scattering events in the ECAL [10]
    • ECAL/FCAL energy and timing [11]
    • ECAL coverage with 2-arm Compton [12]
    • Pi0 calibration [13]
  • Monitoring
  • Restoring PS test setup [14]
    • Assembling PS prototype [15]