JEF meeting, April 18, 2025

From GlueXWiki
Revision as of 09:28, 18 April 2025 by Somov (Talk | contribs)

Jump to: navigation, search

Meeting time and location:

  • ECAL maintenance and performance during the run
    • Issue with the FCAL HV module [1]
    • Flash ADC scalers during first beam [2]
    • Two modules fixed during the accelerator maintenance day [3]
      • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
    • Commissioning of the ECAL trigger [5] [6]
    • Issues with the readout crate during two first two production nights [7]
  • Calibrations
    • First look at Compton scattering events in the ECAL [8]
    • ECAL/FCAL energy and timing [9]
    • ECAL coverage with 2-arm Compton [10]
  • Monitoring
  • Restoring PS test setup [11]
    • Assembling PS prototype [12]