JEF meeting, April 11, 2025

From GlueXWiki
Revision as of 11:28, 10 April 2025 by Somov (Talk | contribs) (Agenda)

Jump to: navigation, search

Connection

Meeting time and location:

Agenda

    • ECAL maintenance and performance during the run
      • Issue with the FCAL HV module [1]
      • Flash ADC scalers during first beam [2]
      • Two modules fixed during the accelerator maintenance day [3]
        • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
      • Commissioning of the ECAL trigger [5] [6]
      • Issues with the readout crate during two first two production nights [7]
    • Monitoring
    • Calibrations
  • Restoring PS test setup [8]